Moore Family
                                                                                       
of Arizona

Home Up Alan Marlene Alex Daniel Travel Things To Do Library Newsletters Photo Album Who Are We Email Us

Home
Up
Smart House
Master Closet
Office Redesign
Loft Storage
Landscaping
Alex's Room
Kitchen
Pool Equip
WaterCop
Bookcase Wall
Pool Slide
Garage
Entertainment Ctr
Scrapbook Area
Laundry Room
Daniel's Room`

Projects in our Current House in Phoenix, AZ

A  chronological listing of projects:

1994  Moved into our current home in Phoenix

    Installed safety pool-fence (contractor)

    Project: Rear Landscaping

Developed a detailed plan - contractor implemented

Leveled most of rear yard by adding rear retaining walls

Added fire-pit & seating area

Install drip & lawn irrigation sod, edging & shrubs / trees

Colored concrete hard-scape to side & front

    Project: Master Closet Storage System Re-design 

Build central organizer block from particle board & paint

Expand existing rack & shelf systems

1995   Contractor installed Garage Cabinets, workbench, pegboard

1996   Project Office Re-Design:

Murphy wall bed, worktop, corner computer workstations

Wall cabinets, under cabinet lighting, networking

Created storage space above garage, pull down stair, flooring, shelving

1997    Project: Rear yard mister system

   Project: Rear yard pool shower system

1998   Project: Play Equipment Set

Standard set erected by contractor

Added bracing for better rigidity

1999  Garage Sports Equipment Organizer Wall

2000   Pool resurfaced with 1" glass mosaic tile

     Front security lighting: timer and dusk sensor

     Side security light 

2001    Project: 100BaseT Wiring

Convert computer network wiring from 10Base2 (BNC Ethernet) 10Mbs

Installed D-Link hub and print server

Installed Cisco DSL router

Installed all new 10BaseT NIC's (Only Laptop is 100BaseT)

2002   Project:  New AC System Installed

                    New  Heat Pumps outside (American Standard)

                    New Air Handlers inside with variable speed fans

                    New air returns added in office & master bedroom to improve circulation

                    New air outlets in master bedroom, duct balance vanes installed

                    New electronic setback controllers added

            Project:  Master Bedroom/Bathroom redecoration

Huge fans on wall

Room divider (between gym and bedroom areas)

Asian border in bedroom and bath

Asian themed decorations

Cubic storage units and floating shelves above

New curtains and pelmets

2003      Project: New Formal Room Bookcase System:

Bookcase wall completed with countertop & cabinets below

New drywall pot-shelf/soffit above, support column with up-light / down-light & cabinet lights

Tri-location house AV system installed, TiVo system installed & storage drive upgraded

Upgraded all networked computer machines to 100BaseT NIC's & 100BaseT hubs

2004    Project: Full scale Kitchen remodel:

             New countertops, flooring, sink, faucet, disposal, lighting & controls

             New & replacement cupboards, handle pulls, drawer organizers, pull-outs

             New appliances: under-counter Fridge drawer, freezer, wine chiller

             New water systems RO filter, expansion tanks, instant hot & cold water

            Project Swimming Pool improvements:

             Swimming Pool converted to automatic Salt Water Chlorination System  (LM2)

             Swimming Pool Slide - basic construction completed

2005   Pool side completed - plumbing into waterfall completed

Completed Kitchen lower pantry cupboards pull out shelf conversion

Completed example upper pantry cabinet pull out conversion

2006   New bed/desk combo unit in Alex's bedroom 

Add 1GB NAS storage device to computer network, upgrade all equipment to 100Mb

Formal room - fabricate a new dual std cone down-light and halogen up-lighter combo

Family room - fabricated fan down-tube mounted cone up-lighter   

Replaced master bed matress: Select Comfort 5000 Adjustable Air Mattress System

2007   Project  Reconfigured audio system to work with new Sony flat panel TV:

Installed 52" Sony Bravia XBR4 HDTV on wall mount

Installed TiVo HD unit to match  HDTV

Replaced large entertainment unit with low level unit for AV equipment

Replaced one Switchlink lighting controller (failed)

Replaced HP double sided printer with double sided multifunction unit

Replaced failed kitchen under-cabinet lighting fixtures

Added additional lighting under microwave (over cook-top)

Replaced the pool salt chlorinator element

Filled in sand pit and created a flagstone patio with umbrella sleeve

Removed the pool fence & tidied up

2008   Installed new aluminum folding loft stairs in garage

Installed new Patio furniture: Table & Directors type chairs

Repaired filtered water system

Repaired under cabinet lighting (config. only this time)

2 attempts at fixing chilled water system (no good)

2009    Created a work area for Marlene's Scrap-booking/Crafts/Art in the master bedroom

Removed the pool fence

Rebuilt the dual std cone down-light & halogen up-lighter combo

Built replacement rear redwood gate & stained it for protection

Installed rolling tool chests in garage (tidy up)

Replaced one Switchlink lighting controller (failed)

2010    Family room entertainment center unit finished:

TV mount/surround & integrated cabinet for AV electronics
New drywall pot-shelf above with up-lights down-lights & Speakers/sub-Woofer

Outside Patio Speakers & BBQ lighting + wiring for Audio/Sound I/O's 

2010    Laundy Room Redesign

Wall of base cabinets w/ pull-out full extension drawers for additional storage
New laminated flooring
New full height base cabinet with pull-out organizer, pull-out shelves & power outlets
New upper cabinets with flip up lids, clothes hanging rail & under-cabinet lighting
Replacement/new handles throughout.
New larger sink & drain units, with soap dispenser
Added shelf above existing cabinets with molding
Re-plumbed dryer vent for close wall clearance, added new hoses & shelf above/si

2011    New teak table outdoors with new chairs

2011   Garage Redesign - (Phase 1)

New high mounted shelves on both sides of the garage
New adjustable shelf units in center divide
New rail bases hanger system for Bike & Bike Rack
New Ladder storage above garage door
New wood sheet storage above garage door
New workbench with integrated shelf cabinet/door & drawer unit
Hutch for roll-about tool cart under workbench
Updated adjustable (movable) parking assistance balls
Recycled old sink from laundry for use in garage (with new plumbing for supply & drain)
New larger capacity and better insulated water heater/tank

2011  Project Pool Equipment Refresh:

New Pump & Motor
New Filter
New Updated Salt Water Chlorinator (LM3)

2012   Total disassembly cleaning of Stainless Steel BBQ

Created a rolling cart for my Wok Burner

Repaired the outdoor patio speakers

Replaced (failed) Jenn-Air built-in microwave over oven with Kenmore built in combo oven
Ran dedicated new wiring and circuit breaker for new microwave oven

Renovated drawer slides for Recycling bin

Another attempt to create a working water chiller (failed again)

Repaired the roof water damage (rot) on front corner (south west) of the house (incorrect construction)

Additional work in Garage (new cart & bench-top power tool solution).

Removal of the mesquite tree in back yard    

2013   Project: Re-constructed Entertainment Electronics Cabinet unit:

            Re-implemented the family room to formal Room/Master Bedroom AV connections

            Installed, populated and wired up the Keystone input/output plates for the entertainment unit connections

            Added connections from the Mac Mini Kitchen computer to the TV/Audio system

            Configured the Mac Mini to play streaming TV shows over HDMI & VGA/Audio

  Created a video & audio switcher for the Mac Mini video to TV - off -  Wall plate to TV

            Added connections to the Wall keystone plate from the Mac Mini for Firewire and for USB 2.0 connections

Project: Patio Furniture - Purchased modular patio furniture - resin-wicker type with 5 seats and 2 side tables

Swapped out new kitchen soap dispenser for old version (hand soap)

Installed soap dispenser in utility room sink

2014  Project: Water Service Upgrades  (Had some time on my hands this year - so lots of catch up projects)

 New insulated water service plumbing, 1/4 turn shut-off valve, pressure limiting valve (80 PSI), water hammer arrestor

 New drain line from water heater drip pan through outside wall

 Added hard and soft water front hose bibs with backflow preventers and 1/4 turn ball valves

  Project: Water Softener & Whole House Filter

Insulated new overhead water supply pipes (across main entryway raceway to Garage) to create water softener loop

Installed new water softener with bypass valve, drip tray, waste to garage sink drain via air-gap, overflow to new external overflow pipe

Installed whole house water filter system with bypass valve, including water pressure gauge & expansion tank

            Project: Ultimate Water-Cop Water Leak Protection System:

            Installed WaterCop shutoff valve in garage with dedicated power supply

            Installed water cop monitoring station & remote switch in utility room and wiring to east and west loft AC spaces

            Special wired sensors acquired and modified to have correct resistance for x2 & x3 sensor circuits

            Hard-wired Sensor circuits installed for:
                1: Garage water softener pan, water tank pan, under garage sink (3 sensors on 1 channel)
                2: Utility Room in Sink Cabinet
                3: Utility Room behind Washing Machine
                4: Master Bedroom in East Sink Cabinet & Under East Sink Cabinet for Shower (2 sensors on 1 channel)
                5: Refrigerator/Ice Maker
                6: Powder Room behind WC - also protects adjacent Pedestal Sink
                7: Bathroom #2 In each sink cabinet (2 sensors on 1 channel)
                8: Bathroom #2 behind WC - also protects adjacent Bath

            Wireless sensors added to Kitchen Island:
                1: In filter cabinet drip pan,   2: In sink cabinet  (2 sensors on 1 channel)
                3: Under sink cabinet            4: behind dishwasher (2 sensors on 1 channel)

            Wireless sensors added to Master Bedroom west side:
                1: In west side sink cabinet
                2: Behind Master WC

As part of this leak protection system I have added a drain down system and an RO shutoff system based on the Water Cop alarm. The water can manually be shut off without effect but if any sensor detects water then the RO tank is shutoff with an electric valve and another electric valve opens on the main water supply to drain down the residual pressure in the expansion tank. This is achieved with a solenoid valve from the cold supply feeding through a limited size orifice and check valve connected to the air gap drain pipe for the water softener. This avoids additional leakage from either source by removing pressure in the main and RO plumbing during any water alarm.


Project: Repair  Damage from Roof Water Leak

Add flashing to the 2nd roof vent from the west, (poor original installation)

Adjust the lead transition up onto the tile

Paint interior ceiling

Repair water damage at ceiling/wall joint - new drywall, tape, texture & paint

Project: Guttering Rear & Front

Replaced guttering at rear of house (painted to match trim)

Added gutter guards to keep birds/debris out

Added drain pipe grilles and drip reducers

Added torrent catcher add on for major run-off area near family room north/west corner window

Added new guttering with gutter guards at front above entry (painted to match trim)

          Project:  Kitchen Island Rebuild (due to flood water damage)

Demolished drywall on back/end of island, removed water filter cabinet

Rebuilt toe kicks (now removable), replaced all drywall and installed borax treatment/insulation

Mold mitigation on cabinet bases (Borax) & ventilation holes drilled

Waterproofed and soundproofed the dishwasher cabinet

Project:  MooreCooler Water Chiller - redesign of the 'coolworks' chiller that didn't chill

New airflow design from open base under cabinet to vent into cabinet

Seal ring added for base cover, new air-filter located on platform in cabinet base (automotive type)

Integrated higher power better max-Td dual TEC element installed

Higher Flow fan installed

Heat-sink to block insulation improved, heat-sink-block mounting bolts fully sleeved & capped

New programmable controller installed based on Arduino

Replacement thermocouple in block and new thermocouple for tank

New heat-sink temperature switches

New high current DC power supply

Insulated the tank top section

Project: Rebuild RO Water Filter: 

Rebuilt water filter box (better) re-installed rebuilt water filter (all new valves)

Change out to new clear filter cartridge vessels due to deterioration of old ones

Relocated post-filter to top of RO unit

Fixed shut-off valve to cabinet for easier operation

Plumbed RO water directly to fridge ice-maker/water supply

Removed axial series expansion tank under sink

Installed vinyl liner in sink cabinet bottom

Install MooreCooler with air filter chamber on plinth base below cabinet bottom

Project: Kitchen Under-Cabinet lighting improvements:

Added new X-10 relay control unit hidden above desk area - with relocated dimmer

Split main under-counter LED lighting across two power supplies for brighter lights

Project: Office LED Under-Cabinet Lighting Update:

Removed old incandescent lighting & dimmer units

Added new LED strips same as in Kitchen

Implemented LV dimmers in each of original 3 locations

Project: Pool Slide Improvements

Added a ball rack under the pool slide

Painted the pool slide

Added a bird deterrent strip to the slide top rail

Added a curved fence below the basketball backboard

Added  large ball return device below the net

Added some keep-out rails around the pool slide platform base

Added bird deterrents (removable) on top of the pool slide

Project: BBQ improvement

Added a paper towel rack to the BBQ   

Adjusted rack design and painted it all black

Project: Patio Lighting Feature

Illuminated & mounted Marlene's garage "M" wall letter

Added an Inline On/Off switch

Project: Master Bedroom TV Upgrade:

Ran Cat5e cabling from Family Room Entertainment Center to Master Bedroom Wall Plates

Component Video from Tivo

RCA Analog Audio

Remote control back to TiVo

Remote control back to Formal Room AV system

Project: Fire Pit & Bench Refurbishment:

Cleaned off old flaking paint on bench/wall, opened up cracks for repair & cleaning

Filled cracks with concrete patch & sanded down

Repainted benches with contrasting seat colour (as before)

Re-set the bench's built in landscape lighting - level & clean-up/relamp fixture

Removed fire-pit brick edging

Replaced the brick edging with random black pebble tile border & grouted

Refurbish the burner element & attachment method, create connector cover

Project: Pool Refurbishments:

Adjusted pool chemistry to use high borate content to manage water line algae

Replaced pool skimmer flappy

Fixed pool light and pool light dimmer

Repaired pool vacuum - replacement base plate and element

Adjusted profile of the pool drain cover (for less vacuum hangups)

Added direct drain pipe to filter cleanout with ball valve & flex piping

Project: Added Mac-Mini connectivity updates:

Added wall plate with VGA in and Audio-in (to TV)

Installed remote buddy bluetooth remote control interface (via Sony BD remote)

Installed Hola Proxy Switcher on Chrome for streaming UK TV shows via a proxy server switcher (BBC/ITV et

Fixed Patio Mister System

Fixed rear landscape lighting

Fixed the TiVo again (another new external hard drive)

Had street lamp fixed

Created hose bib backflow spray guard

Repaired Hose Reel & Hose Sprayer Head

Re-stained the teak patio table (redwood)

Made & mounted two black/white custom frames for Marlene's  30" x 30" & 36" x 36" art canvases in Formal Room

Repaired Alex's blackout blind and vertical blinds

Re-finished the sun shades for the Office,  Alex's room and west facing family room windows (Total of 9)

Repaired the U-Line fridge controller

Replaced 1 Switchlink controller in Kitchen for under-counter lights

Replaced 1 LampLink controller in Formal Room for cone up-lighter

Swapped out new kitchen soap dispenser for old version (hand soap)

          Project: Garage Redesign - (Phase 2)

Support column & beam for garage ceiling/loft support w/ integrated 110v/220V Power outlets
New additional troffer lighting integrated into garage ceiling
New split system AC system dedicated for garage (2 evaporator modules)
Insulated Garage doors & extra weather stripping

Added 220v & GFCI breaker for garage power supply, Added 110v local GFCI for new feeds to support pillar

Copyright (c): Alan Moore 2006 - 2014       Page Updated: 12/16/2014     Page Views: Hit Counter